CV · English

Eivind Haugland

Planning Specialist · Lead Planner · Planning Manager

CV in English. Download the Word version

Download PDF

Professional profile

Planning professional with more than 30 years of experience across oil and gas, offshore wind, process industry and manufacturing. My background spans hands-on fabrication, production management and senior planning roles, with responsibility from early studies through construction, mechanical completion and commissioning.

I bring structure to complex projects by connecting discipline schedules with the work that needs to happen on site. My focus is on clear priorities, realistic sequencing and coordination between teams, with time, cost and risk considered together. I also improve planning methods and help teams put new systems into everyday use.

Extensive experience with Primavera P6, Primavera Risk Analysis, Safran Project, Safran Planner, Microsoft Project, SAP and ProCoSys.

Qualifications

Education

  • Mechanical studies, 1983–1985
  • Trade certificate in platework, 1985–1987
  • Mechanical engineering studies, 1989–1992

Languages & location

Norwegian: native
English: fluent
Swedish: professional working proficiency

Stavanger, Norway / Gothenburg, Sweden

Professional experience

Mar 2023 – Present

Moreld Apply, Norway

Planning Specialist

Gina Krog project for Equinor. Office-based planning for a subsea and topside EPCI contract, covering studies, engineering, procurement, prefabrication, installation and mechanical completion.

Feb 2022 – Feb 2023

Worley, Sweden

Construction and Completion Planner

Nouryon AB wastewater treatment project. On-site planning for greenfield and brownfield construction, mechanical completion and commissioning across civil, piping, mechanical, electrical, instrumentation and insulation disciplines.

Aug 2020 – Jan 2022

Aibel, Norway

Engineering and Completion Planning Lead

DolWin 5 offshore wind project, Haugesund. Responsible for engineering and mechanical completion / commissioning planning, with engineering in Norway and construction and mechanical completion in Singapore.

Sep 2018 – Jul 2020

Worley, Sweden

Planning Manager

L.153 project at Borealis, Stenungsund. Managed on-site planning for engineering, construction, mechanical completion and commissioning across greenfield and brownfield scopes.

Nov 2017 – Sep 2018

AF, Sweden

Planning Lead

LYNX project at Inovyn, Sweden. Led on-site planning for engineering and construction through mechanical completion and commissioning, covering greenfield and brownfield work.

Apr 2017 – Nov 2017

Fabricom Engie

Planning Specialist

Project planning and reporting across offshore flowline and maintenance, modification and operations (MMO) projects.

Aug 2015 – Mar 2017

ABB AB

Offshore Coordination Manager

DolWin 2 offshore wind platform. Planned and coordinated all offshore work, checking that materials, tools, qualified personnel, permits and certificates were in place before execution. Oversaw work preparation to support the offshore schedule.

Feb 2015 – Jul 2015

ABB AB

Completion Planner

DolWin 2 offshore wind platform at Aibel’s Haugesund yard. Planned completion activities during the final yard phase before sail-away and offshore installation.

Aug 2012 – Dec 2014

Aibel AS

Senior Project Planner

Statoil MMO contract. Planned living quarters upgrades on Statfjord A, B and C and the Draupner platform. Worked across multiple projects from study to completion, using SAP and ProCoSys.

Dec 2011 – Jul 2012

MPM AS

Senior Planning and QA Coordinator

Managed facilities and coordinated interfaces for maintenance, construction and building extensions, including production and test facilities. Helped implement Safran Planner to replace Microsoft Project and establish best practice within the planning department.

Apr 2008 – Dec 2011

MPM AS

Production Manager

Managed the production and test department and introduced Lean Production principles. From April 2008 to April 2010, also established and maintained project schedules covering engineering, procurement, installation and delivery. Responsible for implementing Microsoft Project Server and Safran Project.

Mar 2007 – Apr 2008

Fabricom AS

Project Area Lead and Project Manager

Greater Ekofisk Modifications for ConocoPhillips. Managed flowline projects on Ekofisk K, B and A, together with minor maintenance jobs (PMO). Led a 13-person multidisciplinary team covering piping, stress analysis, structural work and instrumentation, and established prefabrication and installation plans for assigned PMO jobs.

Nov 2005 – Mar 2007

Fabricom AS

Senior Project Planning Department Lead

Greater Ekofisk Modifications for ConocoPhillips. Led the project planning group for prefabrication and installation of flowlines and gas lines at wellheads. Established and maintained planning procedures and the project coding structure, with responsibility for weekly schedule updates and progress and time reporting.

Jan 2005 – Nov 2005

Aker Kvaerner Stord AS

Project Planner

Ormen Lange MIC project for Norsk Hydro. Responsible for multidisciplinary planning of the main pipe racks, representing approximately 100,000 work-hours. Established activities for prefabrication and assembly by subcontractors in Belgium and installation at Nyhamna, Norway.

Aug 2001 – Dec 2004

Rogaland County Council

Teacher

Sauda Upper Secondary School. Form teacher and teacher of vocational mechanics, including VK1, with additional teaching in economics and information processing.

Aug 1998 – Jan 2000

Kværner Rosenberg Verft

Project Planner

Åsgård B West project for Statoil. Prepared and monitored schedules for resources, work-hours and progress across multidisciplinary work, main steel, steel fittings, coatings and fire protection.

Dec 1996 – Aug 1998

Kværner Eureka, Tranby

Procurement and Project Planner

CV9030-E infantry fighting vehicle turret project for Hägglunds Vehicle. Planned procurement and inventory requirements in line with project schedules.

Nov 1992 – Nov 1996

Kværner Rosenberg Verft

Planner

Planned prefabrication and assembly hall activities, including space allocation, resources, work-hours and progress. Projects included Flare Boom 16/11-E, Troll Oil MSF, MO, Subsea, Visund Hull, Norne Turret & Sepp, Bingo and Sea Launch.

Oct 1990 – Nov 1992

Kværner Rosenberg Verft

Work Preparation and Planning

Work preparation and planning within the yard.

Jul 1985 – Oct 1990

Kværner Rosenberg Verft

Plateworker and Plate Fitter

Hands-on fabrication and fitting work, providing the practical foundation for subsequent planning and management roles.